Why it matters
Safety grounding is a core powerline topic. Questions test equipotential zones, ground sets and the order of applying and removing grounds.
Key points
- Treat every line as energized until it is tested and grounded.
- Test for absence of voltage before applying grounds.
- Connect the ground end first, then the line end. Remove in reverse.
- Equipotential grounding keeps everything in the work zone at the same voltage.
- Ground sets must be rated for the available fault current.
Study tip
If asked what comes first, the answer is usually testing for voltage.
Try these
When applying protective grounds, connect first to:
- The phase conductor
- The ground
- The neutral last
- Any point
Show answer
B. The ground Ground end first.
Before applying grounds you must:
- Remove the meter
- Test for absence of voltage
- Open the transformer
- Cut the line
Show answer
B. Test for absence of voltage Test before you touch.
Ground sets are sized for:
- Line length
- Available fault current
- Crew size
- Pole height
Show answer
B. Available fault current They must carry fault current safely.
Keep going
Transformer connections · Powerline Technician study guide · Powerline Technician practice questions · Mock exam